Skip to Main Content
Fixers in New Zealand
Start typing to search...
Mount Ngauruhoe - filming location in New Zealand

SCENE 01 / POWER DISTRIBUTION SYSTEMS

Power Distribution Systems

Safe, reliable on-set power for film and TV production in New Zealand.

Scroll

Here is how this works in practice. Power distribution systems safely route electrical today's from power packs or mains sources to lighting, camera, and production gear across a set. Pro distro boxes, cable runs, and breaker panels make sure balanced loads, proper grounding, and safe power delivery to each department.

Here is the short of it. We give power distribution systems configured for your production's electrical needs and set layout. Our team sets up with your gaffer and best boy to make sure the right capacity, cable lengths, and safety gear are in place for each location on your schedule.

Capabilities

Complete Power Solutions

From silent generators to comprehensive distribution systems, we provide the electrical infrastructure your production needs to run safely and reliably.

01

Generator Systems

  • Super-silent generators
  • Tow plant units
  • Multi-gen coordination
  • Battery backup systems
  • Hybrid power solutions

Primary Power

02

Distribution Equipment

  • Main distro boxes
  • Sub-distribution units
  • Lunchboxes & quads
  • Stage pin systems
  • European/US adapters

Safe Distribution

03

Cable Systems

  • Feeder cable runs
  • Extension cables
  • Cable management
  • Ramps & protection
  • Connector systems

Complete Runs

04

Load Management

  • Load calculations
  • Circuit protection
  • Power monitoring
  • Phase balancing
  • Safety systems

Safe Operation

On Location

230V/50Hz NZ-Spec Distro With Vector Energy & Wellington Electricity Tie-Ins

Here is how this works in practice. Power distribution across Aotearoa runs on 230V/50Hz grid spec — matching Australian and UK standards, with Type I plugs distinct from rest-of-world hardware — meaning North American 120V/60Hz cinema gear (incoming with US producers and DPs) routes through dedicated step-down transformer banks plus Hz-conversion stages we factor into the gear list at prep. Power packs stock comes through Aggreko NZ, Cummins NZ, and Caterpillar NZ in 20kVA, 60kVA, 125kVA, and 250kVA Stage 5-rated quiet-run units.

Here is how this works in practice. Mains tie-ins set up with Vector Energy in Auckland and Wellington Electricity in the capital, with Powerco covering Taranaki and central North Island. Distro panels, cable runs, banded looms, and Bates/Cam-lok connectors source through Panavision The capital, Panavision Auckland, Lemac New Zealand, Mediatech NZ, and Filmworx Auckland, with the Wellywood gear pool at Stone Street Studios, Park Road Post, and Weta FX Miramar supplementing for feature-scale builds.

Here is the short of it. DOC permits cover power packs placement and noise emissions in national parks — Fiordland, Tongariro (LOTR Mt. Doom aerials), Aoraki/Mt. Cook, Westland Tai Poutini, and the Mackenzie Country UNESCO Dark Sky Reserve — with strict night-noise limits and fuel-spill containment required. WorkSafe NZ Electrical (Safety) Rules 2010 need licensed NZ-registered electricians on any distro install above 10A. ACC universal accident insurance covers all on-set incidents under the no-fault scheme.

Here is the short of it. Heritage feature power deployments running through this infrastructure have the LOTR trilogy (Caterpillar power packs banks at Stone Street, 2001-2003), The Hobbit cycle, King Kong 2005, Avatar Way of Water (Kumeu Film Studios + Manukau performance capture power load, 2017-2022), and Rings of Power (Amazon Prime Auckland-based concurrent multi-unit power packs banks). Iwi liaison under Te Tiriti o Waitangi applies to any rigging on culturally tapu ground.

FAQ

Power Distribution Expertise

What generator sizes do you provide?

We supply power packs from 20kVA to 500kVA including super-silent units for sound-sensitive shoots. Multi-power packs setups for larger power needs. Battery hybrid systems and tow plant units for many location needs.

How do you calculate power requirements?

We perform detailed load calculations based on your lighting package, camera and DIT needs, video village, and all other electrical needs. We factor in startup loads and give appropriate headroom for safe, reliable operation.

Can you provide power at historic locations?

Here is the breakdown. Yes, we specialize in powering shoots at New Zealand's historic heritage buildings, Maori cultural sites, and covered natural environments. We set up with venue needs, give appropriate cabling without damage, and make sure compliance with preservation guidelines.

Do you handle tie-ins to venue power?

Here is what that looks like on the ground. We set up tie-ins to venue electrical systems where appropriate, working with licensed New Zealand electricians and venue tech staff. We check ready power, arrange short-term connections, and make sure safe disconnection after your shoot.

What about power for remote locations?

For remote exteriors without mains power, we give complete power packs solutions including fuel management, noise mitigation, and multi-day operation. We plan logistics to make sure uninterrupted power across your shoot.

How do you ensure electrical safety on set?

All gear is PAT tested and well rated. We use RCD protection across, employ licensed electricians, and follow New Zealand electrical rules. Detailed records and safety briefings make sure crew awareness.

Productions in New Zealand that need this often pair it with Power Solutions for full coverage. Most projects also draw on Grip Equipment and Portable Power Solutions.

On Set

Need Production Power?

Tell us about your production and we'll design a safe, reliable power solution.